Australia grading and drainage — prepare a project brief

Start a grading brief with the surface’s intended use, existing survey and water route. Add the equipment, material and field access so the proposed machine configuration can be assessed.

From paddock to civil surface

For an irrigated bay, record the target field level and management of inlet and outlet water. For a farm lane or hardstand, record the intended traffic, material and drainage route. For a sports surface, specify the required finish and the design and acceptance criteria supplied by the project.

Australian project information

Include the state or territory, local site constraints, services information, land access and approvals relevant to the proposed work. Confirm project-specific requirements with the responsible parties and appropriately qualified advisers. Frank’s Final Grade enquiries cover application investigation, development and consultation.

Check fall and drainage · Verify the finish · Enquire about rental and leasing

Civil Levelling and Surface Water Management

Video details and summary · Dugong Scrapers on YouTube

Updated 2026-11-19