Problem Diagnosis
Misplaced Fill
Misplaced fill may be in the wrong location, wrong layer or wrong volume state. Before relocating it, establish whether it is suitable for the new receiving area.

Plan the surface handover
BeforeIdentify fill source, condition and intended destination.
Work stageKeep different material classes separate and plan collection, haul and placement routes.
AfterPlace the material in the required arrangement and verify the receiving surface.
What to verify
Record where the fill came from and where it went.
Diagnosis should distinguish the visible symptom from its cause. Record whether the fault appeared after traffic, a water event, settlement or earlier earthworks. That history helps decide whether the response is a local surface correction, a drainage intervention or a more substantial investigation.
Scope and limits
Unknown or unsuitable fill should not be spread for convenience.
Continue the job brief
Include the location, existing condition, intended surface, material, available tractor and proposed dates.
