Building Pad Surface Handover
A building-pad handover must identify the formation, level reference and evidence for the intended foundation work. Geometry and material suitability are separate acceptance questions.

Plan the surface handover
What to verify
Check thresholds and surrounding runoff as well as the pad surface.
The finished purpose sets the acceptance question. Agree the receiving contractor or operator, the design reference and the evidence required before construction starts. Keep geometric checks separate from material and operational checks so the handover states what has actually been established.
This guide does not establish bearing capacity or certify engineered fill.
Continue the job brief
Include the location, existing condition, intended surface, material, available tractor and proposed dates.