Surface Planning

Global Land Grading Knowledge Centre

The knowledge centre connects four decisions: the finished purpose, the problem stopping it, the work needed to correct it, and the equipment that can perform that work. Start with the symptom or project rather than a machine name when the cause is uncertain.

Red scraper preparing a rugby ground — application concept
Red scraper preparing a rugby ground · Supplied application concept

Plan the surface handover

BeforeChoose a design, application or equipment pathway.
Work stageUse the surface guides for requirements, application guides for job planning and equipment guides for the machinery sequence.
AfterTake a clear project brief to the person arranging design or rental.

What to verify

Compare the selected guide with the actual site conditions.

Confirm the proposed configuration, worksite conditions and intended use before deployment. Describe the function required and assess it with the complete tractor and implement combination. Concept illustrations are not confirmation of available equipment or approved loading.

Scope and limits

Country or town names do not establish a local branch, completed project or available rental machine.

Continue the job brief

Discuss this work

Include the location, existing condition, intended surface, material, available tractor and proposed dates.