Machine Before - Dugong - Machine After
The machine before Dugong determines what material arrives; the machine after Dugong determines what surface must leave. An excavator can expose formation, a loader can deliver a stockpile, and a roller can compact the placed layer. The scraper's role is bounded by those interfaces.

Plan the surface handover
What to verify
Record which operation owns levels, materials and final acceptance.
Confirm the proposed configuration, worksite conditions and intended use before deployment. Describe the function required and assess it with the complete tractor and implement combination. Concept illustrations are not confirmation of available equipment or approved loading.
The workflow can include Dugong where suitable; it does not assume Dugong replaces adjacent equipment.
Continue the job brief
Include the location, existing condition, intended surface, material, available tractor and proposed dates.
