Survey, Design & Verification

Design - Measure - Move - Verify

Design, measure, move and verify is a closed loop. The verification step tests whether the movement achieved the design rather than merely whether the operator followed a display.

Plan the surface handover

BeforeIssue an agreed surface design and reliable control.
Work stageMeasure existing conditions, move the required suitable material, then compare the result with the target.
AfterCorrect residual defects and record acceptance before the next operation.

What to verify

Use independent observations for the final check.

Keep the design reference and survey evidence traceable. State units, coordinate system, vertical datum and revision, then compare independent checks with the issued target. Surface measurements establish geometry; they do not establish the material quality of a buried layer.

Scope and limits

Do not treat production guidance and acceptance evidence as the same record.