Finished Surface Handover
Sports Turf Surface Handover
A sports-turf handover should identify the formation, drainage and growing-layer system delivered. Playing-surface appearance alone does not establish venue acceptance.

Plan the surface handover
BeforeObtain the applicable project and sport requirements.
Work stageCheck geometry, layer arrangement and drainage interfaces before turf conceals the work.
AfterComplete the venue's inspection and release process.
What to verify
Retain measured levels and relevant construction records.
The finished purpose sets the acceptance question. Agree the receiving contractor or operator, the design reference and the evidence required before construction starts. Keep geometric checks separate from material and operational checks so the handover states what has actually been established.
Scope and limits
No sport or venue compliance is claimed from illustration or grading alone.
Continue the job brief
Include the location, existing condition, intended surface, material, available tractor and proposed dates.