High-to-Low Redistribution
High-to-low redistribution can reduce local quantity imbalance when the high area's material suits the low area's intended use. It should follow measured levels, not visual guesses.

Plan the surface handover
BeforeMark confirmed cut and fill areas and soil layers.
Work stageMove suitable material in manageable loads and stop cutting as the planned level is reached.
AfterPrepare the placed material and recheck the profile.
What to verify
Compare productive-layer depth in both source and receiving zones.
Each project stage has a receiving operation and an acceptance question. Record what is complete, what remains and which reference the next team should use. Correct quantities before refining geometry, and do not cover an unaccepted layer simply to keep the sequence moving.
Scope and limits
Some low areas are designed drains and should not be filled.
Continue the job brief
Include the location, existing condition, intended surface, material, available tractor and proposed dates.