Hard Clay Grading
Hard clay can demand a preparation step before controlled redistribution. Forcing a deep cut may increase traction demands without producing material suitable for the receiving layer.

Plan the surface handover
What to verify
Inspect both the cut material and the receiving surface for large void-forming clods.
Material roles matter as much as surface levels. Growing medium, structural fill and pavement aggregate should not be treated as interchangeable simply because all can be moved by a scraper. The preparation and acceptance method must follow the intended layer.
Rock-like or cemented material may require different equipment.
Continue the job brief
Include the location, existing condition, intended surface, material, available tractor and proposed dates.
